1/2
Rail Bridge Repairs
Client: KiwiRail
Contract Value: Ongoing
Project Duration: Ongoing
Libbet regularly undertake works to restore railway overbridges damaged by vehicle strikes. These works see the Libbet team travel throughout New Zealand to carry out steelwork and concrete repairs.
The repairs vary from steel surface preparation and applying new coating systems to concrete repairs including the application of fibre composites.
Key to the success of these projects is the detailed planning to ensure access to the road and rail is optimised and the strict quality assurance processes are followed.